• Invergordon Service Base

Turnkey Heavy Lift and Transport Solution at Invergordon Service Base

Client: NTG Projects
Industry: Heavy Lift and Marine Logistics

PSG Marine & Logistics completed a turnkey heavy lift and transport solution for NTG Projects at Invergordon Service Base.

The project involved the load-out of a 100-tonne CTU. PSG handled lifting design, specialist transport within the service base, and quayside stevedoring.

PSG used a six-month planning period to prepare the full load-out operation. The work required an engineered solution before the CTU could be moved to the load-out quay.

The CTU’s integrated lifting system was no longer operational. PSG created a new lifting arrangement for the project.

rope - section icon

Project Challenges And Solutions

Crane lifting 100-tonne CTU during load-out at Invergordon Service Base
hand icon symbolising trust

Project Challenges

The project required a complete heavy lift and transport solution. PSG had to plan the lift, transport, and quayside stages as one controlled operation.

The 100-tonne CTU needed structural assessment before the load-out could proceed. Its integrated lifting system could no longer be used.

PSG also had to design and fabricate a compliant lifting solution. This was required before the unit could be handled for the load-out.

Vessel arrival times could change. PSG needed a plan that could respond to the vessel schedule.

The project required:

  1. Structural assessment of the 100-tonne unit.
  2. Design and fabrication of a compliant lifting solution.
  3. Specialist transport within Invergordon Service Base.
  4. Coordinated quayside operations to meet vessel schedules.
  5. Control over timing when vessel arrivals changed.
Hands shaking icon symbolising agreement

Project Solutions

PSG worked closely with NTG Projects to create a safe and feasible lifting arrangement.

The engineering review focused on three areas:

  • Weight distribution.
  • Structural integrity.
  • Lift geometry.

The agreed solution involved four 55-tonne pad eyes. These were welded to the CTU structure.

Scaffolding was erected for safe access. PSG then managed controlled welding and full compliance load testing.

PSG coordinated the local supply chain at each stage. Each part of the work followed the required standards and schedule.

rope - section icon

CTU Transport and Quayside Execution

Specialist Transport

PSG moved the CTU from its laydown position to the load-out quay.

For this stage, PSG mobilised:

  • 22 axles plus 1 PPU of K24 SPMT.
  • A 4-file, 11 combination configuration.

PSG’s in-house operators carried out the move. Detailed engineering planning controlled the transport stage.

The transport arrangement helped PSG respond when vessel schedules changed. It also reduced the risk of costly delay during the load-out phase.

Quayside and Stevedoring Operations

At the quayside, PSG managed the full hook-up operation to the vessel’s geared crane.

The team used a Terex RT45 with a man basket. This supported safe working at height during the rigging operation.

PSG used two working teams in parallel:

  1. One SPMT crew.
  2. One stevedoring crew.

This working structure kept the hook-up process within the vessel’s operational window.

Reliable services icon representation

Project Outcome

PSG completed a fully engineered and compliant lifting solution for the 100-tonne CTU load-out.

The heavy transport stage moved the unit from its laydown position to the load-out quay. PSG also managed the hook-up operation to the vessel’s geared crane.

The project brought lifting design, specialist transport, and quayside stevedoring into one turnkey package for NTG Projects.

rope - section icon

Client

Testimonial

Visual divider element icon
“It is a pleasure working with Sarens PSG in Invergordon. We received professional support all the way through the different stages from initial quotation, planning, and actual execution of the project. Every time the scope of work changed or increased, we managed to find a good solution where Sarens PSG demonstrated their flexibility. All activities were carried out safely and without any remarks and we can highly recommend using the service of Sarens PSG.”
Anders Gosmand, NTG Projects
rope - section icon

Comprehensive Solutions for
Your Project Needs

PSG Marine & Logistics offers a full suite of services, coupled with an expert team and advanced fleet, ensures we are your trusted partner for even the most demanding projects.

Port Agency Services

Port
Services

Expert loading and unloading services, potable water delivery, and secure storage solutions available at major ports across the North East, including Aberdeen and Invergordon.
Marine Logistics Service

Marine
Logistics

Specialised support for offshore wind, oil and gas, and marine construction projects, including crew transfers, cargo transport, and towage.
Reliable Lifting Solutions

crane hire
Service

Our fleet includes mobile telescopic and heavy-lift cranes, available for projects in Aberdeen, Inverness, Cromarty Firth, and throughout Scotland. From short-term lifts to long-term projects, we ensure efficiency and safety at every stage.
Heavy Lift Service

Heavy lift
& transport Services

Planning and executing complex transport projects with cutting-edge equipment, including SPMTs, heavy lift strut cranes, and low loaders for abnormal loads.

Key industries
We Serve

Expert quayside solutions for diverse sectors.
image showing a crane service
machine showing available services
Visual divider element icon

Contact PSG

Ready to experience the PSG difference? Contact our crane hire experts today to discuss your project requirements.
    Send Enquiry