PSG Marine & Logistics carried out the installation of five double-skinned fuel storage tanks at the Wefco site in Westhill, Aberdeen. Each tank weighed between 15 Te and 17.3 Te. The work required precise crane lifting and accurate placement within the construction area. The operation was performed under contract lift conditions. The planning and execution followed the agreed lift plan throughout.

rope - section icon

Project Challenges And Solutions

Fuel storage tank being lowered into position at Wefco
hand icon symbolising trust

Project Challenges

The project required lifting and installing five fuel storage tanks within an active construction environment. The tank weights ranged from 15 Te to 17.3 Te.

The client’s time constraints placed pressure on programme delivery. The installation had to progress in line with site requirements.

The deteriorating weather conditions in Scotland during January increased operational difficulty. The lifting activities required careful coordination under changing site conditions.

Hands shaking icon symbolising agreement

Project Solutions

PSG utilised the Liebherr LTM 1160 mobile crane for the lifting operation.

The crane was selected to match the load range of the tanks. The configuration supported safe lifting and placement within the defined working area.

PSG’s contract lift team managed the operation on site. The lift plan was followed, and all lifting activity was carried out in accordance with the client’s requirements.

rope - section icon

Project Execution

The team installed each tank in sequence. The lift plan governed crane positioning and load handling throughout the operation.

The ground personnel coordinated closely with the crane operator during each lift. The tank positioning was carried out precisely in line with the agreed method.

The weather conditions and programme demands remained factors throughout January. The lifting works progressed safely and professionally on site.

Reliable services icon representation

Project Outcome

All five double-skinned fuel storage tanks were installed safely and within the required timeframe. The lifting operation concluded with full adherence to the lift plan and contract lift controls. The client’s programme objectives were achieved without incident.

PSG Marine & Logistics carried out the operation precisely and professionally in line with the client’s requirements.

For project enquiries, contact PSG Marine & Logistics on 01224933720 or email sales@psg-inv.com.

rope - section icon

Comprehensive Solutions for
Your Project Needs

PSG Marine & Logistics offers a full suite of services, coupled with an expert team and advanced fleet, ensures we are your trusted partner for even the most demanding projects.

Port services

Port
Services

Expert loading and unloading services, potable water delivery, and secure storage solutions available at major ports across the North East, including Aberdeen and Invergordon.
Marine logistics services

Marine
Logistics

Specialized support for offshore wind, oil and gas, and marine construction projects, including crew transfers, cargo transport, and towage.
Reliable Lifting Solutions

crane hire
Service

Our fleet includes mobile telescopic and heavy-lift cranes, available for projects in Aberdeen, Inverness, Cromarty Firth, and throughout Scotland. From short-term lifts to long-term projects, we ensure efficiency and safety at every stage.
Heavy lift service

Heavy lift
& transport Services

Planning and executing complex transport projects with cutting-edge equipment, including SPMTs, heavy lift strut cranes, and low loaders for abnormal loads.

Key industries
We Serve

Expert quayside solutions for diverse sectors.
Visual divider element icon

Contact PSG

Ready to experience the PSG difference? Contact our crane hire experts today to discuss your project requirements.
    Send Enquiry